Value | Category | Cases | |
---|---|---|---|
-SHARPS ARE BURNT IN A PIT | 1 |
2.6%
|
|
ACILITY IN-CHARGE WHO HAS BEEN TRANSFERED TO ANOTH | 1 |
2.6%
|
|
AND NO RESUSCITATION PACK MIDWIFE HOWEVER MANAGES | 1 |
2.6%
|
|
AT THIS FACILITY. | 1 |
2.6%
|
|
AVE STEAM PRESSURE COOKER (GAS) | 1 |
2.6%
|
|
CTION AND BOILING METHODS ARE USED FOR DISINFECTIO | 1 |
2.6%
|
|
D 1ML SYRINGES Q194 NO ELECTRICITY SO SUCTION ASPI | 1 |
2.6%
|
|
D. | 1 |
2.6%
|
|
E IS NO DELIVERY SET. SUCTION ASPIRATOR IS VERY OL | 1 |
2.6%
|
|
E TO PROVIDE SERVICES. | 1 |
2.6%
|
|
EQUESTED FOR PERSONAL INTRODUCTORY LETTERS FROM TH | 1 |
2.6%
|
|
ER. | 1 |
2.6%
|
|
ESSURE GAUGE) WATER DOES NOT FLOW AT THE THEATRE F | 1 |
2.6%
|
|
G AND DRESSINGS | 1 |
2.6%
|
|
GAS STOVE | 1 |
2.6%
|
|
HERE IS NO DRUM | 1 |
2.6%
|
|
HICH HAS NEVER BEEN USED. NEW WHEEL CHAIRS AVAILAB | 1 |
2.6%
|
|
IC PATIENTS. | 1 |
2.6%
|
|
IENTS ONLY IF THEY ARRIVE BECAUSE OF THE REASON TH | 1 |
2.6%
|
|
IF HE IS NOT AROUND THEY REFER CLIENTS TO ST MARTI | 1 |
2.6%
|
|
INCE THE LABOUR WARD STERILIZER IS NOT FUNCTIONAL. | 1 |
2.6%
|
|
MENT AND RESUSATATION EQUIPMENT. | 1 |
2.6%
|
|
N OUT DURING DELIVERY. | 1 |
2.6%
|
|
NCTIONING | 1 |
2.6%
|
|
NG-IN WARD IS ALSO ANOTHER PROBLEM. THEY DO NOT HA | 1 |
2.6%
|
|
NOT ON THE MANUAL EITHER. | 1 |
2.6%
|
|
NSTALLATION HAS NOT BEEN FUNCTIONAL | 1 |
2.6%
|
|
OR ORAL THERMOMETER. | 1 |
2.6%
|
|
OVIDED AT THE FACILITY. | 1 |
2.6%
|
|
Q197:THEY DO HIGH LEVEL DISINFECTION FOR THEIR FOR | 1 |
2.6%
|
|
RACTOR BUT SHE IS NOT TRAINED TO USE IT | 1 |
2.6%
|
|
T HAS NOT BEEN GIVEN. | 1 |
2.6%
|
|
T WOMEN IN LABOUR COULD NOT GO THEIR TO DELIVER TH | 1 |
2.6%
|
|
THERE IS NO FUNCTIONING INCINERATOR BUT A PIT HAS | 1 |
2.6%
|
|
TO USE AND BRING IT BACK FOR SAFE KEEPING. | 1 |
2.6%
|
|
TOWELS. | 1 |
2.6%
|
|
UNCOMFORTABLE. | 1 |
2.6%
|
|
WITH BLEACH & DETTOL. | 1 |
2.6%
|